SECTION 401
DENSE GRADED BITUMINOUS CONCRETE PAVEMENTS
401.03 CONSTRUCTION METHODS.

401.03.13 Surface Tolerances. The surface will be tested by the Engineer at selected locations, using an approved 10-foot straightedge furnished by the Contractor. The variation of the surface from the testing edge of the straightedge between any two contacts with the surface, shall at no point exceed 1/4-inch. All humps or depressions exceeding the specified tolerance shall be corrected by removing defective work and replacing it with new material as directed.

 

SECTION 501

PORTLAND CEMENT CONCRETE PAVEMENT AND BASE

501.03 CONSTRUCTION METHODS

501.03.10 Final Strike-off, Consolidation and Finishing of Concrete Pavement

 

f. Straightedge Testing and Surface Correction. After the floating has been completed and the excess water removed, but while the concrete is still plastic, the surface of the concrete shall be tested for trueness with a 10-foot straightedge. For this purpose the Contractor shall furnish and use an accurate 10-foot straightedge swung from handles 3 feet longer than one-half the width of the slab. The straightedge shall be held in contact with the surface in successive positions parallel and perpendicular to the road centerline and the whole area gone over from one side of the slab to the other as necessary. Advance along the road shall be in successive stages of not more than one-half the length of the straightedge. Any depressions found shall be immediately filled with freshly mixed concrete, struck off, consolidated, and refinished. High areas shall be cut down and refinished. Special attention shall be given to assure that the surface across joints meets the requirements for smoothness. Straightedge testing and surface corrections shall continue until the entire surface is found to be free from observable departures from the straightedge and the slab conforms to the required grade and cross section.

 

SECTION 814

PLACEMENT OF CONCRETE BRIDGE DECKS

814.03 CONSTRUCTION METHODS

814.03.7 Finishing

 

 

c. Tolerances. Verification of the completed surface of the deck, in accordance with the grades and cross slope specified on the contract drawings, shall be made during placement and again after the deck has been cured. When the concrete is still plastic, the deck surface shall be tested with a ten-foot straight-edge and any variance in excess of 1/8-inch in 10-feet shall be corrected immediately. In the event that this tolerance is not met when tested after the concrete has hardened, variance in excess of 1/8-inch in 10-feet shall be corrected at the Contractor's expense in a manner satisfactory to the Engineer.